I have to say, I was quite nervous about the number pool. My #1 and #7 projects are quite large, and I can already tell that I will need a "project plan" to finish them within the month. I am glad that this is a smaller project to finish so that I can continue to focus on my hand piecing, which I am really enjoying right now.
One day I made a list of all the projects I had, and then promptly decided I had a problem. So this is my method to fix it. 15 minutes a day, one project a month. Maybe some other fun stuff along the way.
Friday, February 1, 2013
Another Table Topper for Connie's Game!
Today Connie pulled #6 for February, which is my Fruit and Veggie Table Topper that needs to be quilted and bound. This started as a Zakka class last year and I completed the top at the quilt retreat in September using some fabric found during our shopping along the way (love how that works out!). I think I will need to buy some backing for it or locate/make something work.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment